ORGANISATION · FR · NACE 35.11 Production of electricity (gas-fired)
GazelEnergie (EPH group)
gazelenergie.fr · 1 documented exposure in the atlas.
Meuse low flow at Chooz, the 1998 Franco-Belgian flow thresholds and the two Chooz nuclear units, July–November 2026
Beneficiary · Financial, remote · deduced · Low water, 2026-08-01
“GazelEnergie entend être moteur de la transition énergétique de ses sites industriels (le site de Provence à Gardanne-Meyreuil, le site Émile Huchet à Saint-Avold…) pour en faire des plateformes régionales de valorisation énergétique de référence.” — source, 2026-11-12
GazelEnergie names the Émile Huchet site at Saint-Avold as its own; the RTE registry lists two combined-cycle gas units of 434 MW each there, in the same Grand Est region where nuclear output halved. That these units ran more during the Chooz stoppage is inferred from the national gas-output series; unit-level generation and margins were not read.
Series concerned: france-gas-output-mw grand-est-nuclear-output-mw fr-day-ahead-eur-mwh · read the edition →
Positions are stated per signal with the public evidence that supports them. An organisation can ask for a correction at the address in the footer.