Meuse low flow at Chooz, the 1998 Franco-Belgian flow thresholds and the two Chooz nuclear units, July–November 2026

Exposed · Financial, remote · evidenced · Low water, 2026-08-01

“Chooz B1-B2 (initial series unit N4): Electrabel (21,7%);” — source, 2026-11-12

EDF's 2022 Universal Registration Document lists Electrabel as the co-contracting party assigned 21.7% of the capacity of Chooz B1-B2 under a generation allocation contract, and states on the same page that 'the total amount of power sold at the variable cost of the fuel is determined by the availability of a broader baseline fleet of power plants'. If those terms still hold, a stop of Chooz alone is carried by EDF and reaches Electrabel's volumes only through the availability of that wider fleet; the terms in force in 2026 and any 2026 volume were not read. The group also owns gas-fired plants in Belgium and France, and its Tihange 3 reactor on the Meuse was already offline for works.

Series concerned: grand-est-nuclear-output-mw meuse-chooz-flow-12d-mean-m3s be-day-ahead-eur-mwh · read the edition →