ShockAtlas

ORGANISATION · BR · NACE 35.11 Production of electricity (hydro, wind); 35.13 Distribution of electricity

Companhia Paranaense de Energia (Copel)

www.copel.com · 2 documented exposures in the atlas.

Brazil's power grid under El Niño: southern inflow at four times its mean over 1 to 11 November 2026, turbinable water spilled in daylight hours

Exposed · Operational, local · evidenced · Supply shock, 2026-11-06

“Diante do cenário de chuvas constantes, a companhia mantém a estratégia operacional de preservar os reservatórios abaixo dos limites máximos de armazenamento, operando com comportas de vertedouros abertas nas usinas situadas nos rios Iguaçu, Tibagi e Capivari.” — source, 2026-11-13

The article of 11 September 2026 shows Copel running its Iguaçu, Tibagi and Capivari plants with spillway gates open. In the ONS open-data file of turbinable spilled energy for 1–11 November 2026 (sum by agent, hourly values averaged), the agents Copel-GT (Salto Caxias, Segredo, Parigot de Souza) and FDA Geração (Foz do Areia) sum to about 1,160 MW average, the largest share of the South. That FDA Geração and the Mauá consortium are Copel vehicles is taken from the article's wording, and the revenue effect through the hydrological reallocation mechanism is inferred, not read.

Series concerned: south-turbinable-spill-mwmed south-total-spill-mwmed south-ena-gross-pct-mlt south-hydro-generation-mwmed · read the edition →

Brazil's power grid under El Niño: southern inflow at four times its mean over 1 to 11 November 2026, turbinable water spilled in daylight hours

Adjacent · Operational, local · deduced · Supply shock, 2026-11-06

“Os dados do mercado faturado da Copel DIS consideram o desconto da energia compensada pelos sistemas de MMGD. No 3T26, os créditos injetados por geradores próprios somaram 992 GWh (frente a 782 GWh no 3T25).” — source, 2026-11-13

Copel's distribution arm reports 992 GWh injected by distributed generators in the third quarter of 2026, up from 782 GWh a year earlier. Distributed generation is outside the operator's dispatch and adds to the midday surplus that the dispatched plants absorb; the distributor also relays the operator's cut orders to small plants on its network. The link between this volume and the November spill is inferred, the article does not make it.

Series concerned: south-cmo-halfhourly-daily-mean-brl-mwh southeast-cmo-halfhourly-daily-mean-brl-mwh south-turbinable-spill-mwmed · read the edition →

Positions are stated per signal with the public evidence that supports them. An organisation can ask for a correction at the address in the footer.

Premium, 49 USD / month: every published analysis as files, with a key for the API and the MCP server.What Premium includes →