ShockAtlas

ORGANISATION · NO · NACE 24.42 Aluminium production (smelters at Lista, Agder, and Mosjøen, Nordland)

Alcoa Norway AS

www.alcoa.com · 1 documented exposure in the atlas.

South-west Norway (NO2) enters winter with its reservoirs at 50.8 percent, the lowest for late November since 1995; Norwegian exports had not collapsed by October, and the direction of trade over the winter is open

Exposed · Supply chain · evidenced · Drought, 2026-10-16

“At Alcoa Lista, power contracts cover 90% of consumption through 2027.” — source, 2026-11-25

The company's 2025 annual report states the contract cover of the Lista smelter, which is in Agder. For the Mosjøen smelter the preceding sentence says the remaining power is purchased at spot prices; the report does not say how the uncovered tenth at Lista is priced, so its exposure to the NO2 spot price this winter is inferred. Statkraft's release of 18 June 2026 adds that line 2 at Lista was restarted to 95,000 tonnes a year and that new contracts for about 4.8 TWh run from 2028 to 2031. The cost of the open tenth in kroner, and any decision to adjust output, are not stated.

Series concerned: no2-day-ahead-eur-mwh-weekly no2-day-ahead-eur-mwh-monthly · read the edition →

Positions are stated per signal with the public evidence that supports them. An organisation can ask for a correction at the address in the footer.

Premium, 49 USD / month: every published analysis as files, with a key for the API and the MCP server.What Premium includes →