ShockAtlas

ORGANISATION · BR · NACE 94.11 Activities of business and employers membership organisations (small hydro generators)

Associação Brasileira de Geração de Energia Limpa (Abragel)

abragel.org.br · 1 documented exposure in the atlas.

Brazil's power grid under El Niño: southern inflow at four times its mean over 1 to 11 November 2026, turbinable water spilled in daylight hours

Exposed · Operational, local · evidenced · Supply shock, 2026-11-06

“Em pesquisa feita pela Abragel com 178 usinas após o primeiro acionamento, 47 delas registraram “vertimento turbinável” – quando a água passa pelo vertedouro, sem gerar energia.” — source, 2026-11-13

The article of 30 October 2026 reports the association's survey: 47 of 178 small hydro plants spilled turbinable water after the operator's surplus plan was triggered on 7 June 2026. These plants are not in the ONS spill file, which covers dispatched reservoirs only, so their loss comes on top of the measured series. No activation of the plan in November 2026 was read.

Series concerned: south-turbinable-spill-mwmed south-total-spill-mwmed south-ena-gross-pct-mlt · read the edition →

Positions are stated per signal with the public evidence that supports them. An organisation can ask for a correction at the address in the footer.

Premium, 49 USD / month: every published analysis as files, with a key for the API and the MCP server.What Premium includes →